Probiters Exim LLP
OFFICIAL TECHNICAL DOSSIER ISO 9001:2015 CERTIFIED | AHMEDABAD, INDIA
INSULATOR & POLYMER PROCESSING

Batch Weighing System

Automated Multi-Ingredient Loss-in-Weight Dosing Station

EXECUTIVE TECHNICAL DOSSIER & DATASHEET ISO 9001:2015 CERTIFIED DESIGN BASIS v5.0
Executive Value Proposition

Commercial & Operational Highlights

Automated Multi-Ingredient Loss-in-Weight Dosing Station

PAYBACK PERIOD 5.8 Months
ANNUAL SAVINGS ₹11.4 Lakhs / yr
PLC AUTOMATION Siemens
LEAD TIME 4–6 Weeks
Proven Field Performance

Customer Success & Verified Financial ROI

❌ COMPETITOR PITFALLS

Manual hopper tipping caused ±3.2% formulation errors, operator chemical dust exposure, and batch density variations.

PROBITERS ADVANTAGE

Probiters Multi-Ingredient Automated Loss-in-Weight Feeder Array with dust-sealed pneumatic conveying and load cell accuracy to 1g.

✓ FINANCIAL OUTCOME
FORMULATION DOSING ACCURACY:
±3.2% Reduced to ±0.05%
"We eliminated batch density variations completely. Operators work in a clean dust-free environment with 100% consistent quality."
Machine Intelligence

Complete Parameter Matrix Table

Engineering FieldVerified Specification / Design Basis
Weighing Accuracy1 gram precision on 50 kg batch hoppers
Dosing Speed45 seconds per multi-ingredient formulation
Dust ExtractionIntegrated HEPA filtration dust-sealed manifold
Hopper Count4 to 8 ingredient hoppers with screw feeders
ERP IntegrationDirect OPC-UA Ethernet connection to plant ERP
CAD Blueprint Architecture

General Arrangement Vector CAD Drawing

PROBITERS EXIM LLP // GENERAL ARRANGEMENT (GA) SCHEMATIC BATCH WEIGHING SYSTEM PROBITERS EXIM LLP — INDIA DWG NO: GA-CAD-2026-BW05 SCALE: 1:15 CAD SHEET: 01 / 01 STATUS: APPROVED FOR CONCEPT ENGR: R&D DEPT DESIGN BASIS & ENVELOPE DIMENSIONS BATCH CAPACITY: 250 kg / CYCLE WEIGH ACCURACY: ±0.1% FULL SCALE RECIPE MEMORY: 100 MULTI-COMPONENT RECIPES BATCH WEIGH HOPPER (3x LOAD CELLS)
Operating Sequence

Visual Process Workflow Stepper

01PART LOADINGPosition component onto application-specific fixture
02POKA-YOKE VERIFYSensors validate orientation and clamp closure
03PLC EXECUTIONServo/hydraulic motion profile executes test sequence
04LOG & RELEASETelemetry logs OK/NOK result and releases part

Need a customized proposal or 3D layout simulation? Our engineering team prepares custom SPM quotes within 3–5 working days.

Request Machine Proposal →